Garden Trail Preparation and Maintenance
- Author Jeremy Smith
- Published June 27, 2010
- Word count 423
Adding a garden trail to a yard can really beautify an already landscaped yard or it can be a wonderful focal point to build around. Everyone has an opinion as to what kind of material should be used in constructing a trail or walkway. The choice of material is strictly up to the individual but be careful; the key to a long lasting path is really in the preparation of the space.
Obviously locating a space for the trail is one of the first things to do. Take as much time as needed on this step. Once the area has begun to be prepped starting over in a new spot can be a frustrating proposition. A suggestion is to get a can of marker spray paint, available at any hardware store, and mark the outline of the trail. Take a few days with the space marked, if you are comfortable with it then proceed to digging out the area.
The digging depth needs to be determined at the beginning of the project. After you choose your surface material you will need to add the underlayment depth. Sandy soils drain quicker than clay soils so you will need to add less sand or drainage rock to the ground prior to laying your trail. An overlooked step to the ground preparation is the soil compaction. If the ground is not as flat or compacted as possible it is likely that the trail will appear uneven and could even be a tripping hazard. Check around for a local equipment rental company and rent a taper for a day to get a solid underlayment for the trail.
The time to dig out the trail will vary on the size and the native soil conditions. If the soil is sandy digging can be quick and relatively effortless. Homeowners with clay soil will need a little bit longer as their soil is less cooperative especially in the dry summer months.
If bricks or pavers are being used make sure a weed block is installed on top of the dirt. It is also recommended to sweep sand into the cracks between the bricks. This will help in keeping any weeds at bay.
For concrete poured paths don't forget to add control joints. These are 1/2" grooves scoured into the concrete. A rule of thumb is to have one no further than the width of the walkway. Example, a four foot wide walk should have a joint every four feet.
These steps will help create a trail to enjoy for many years.
Author is a freelance writer. For more information on skyland trail please visit http://www.twitter.com/skyland_trail/.
Article source: https://articlebiz.comRate article
Article comments
There are no posted comments.
Related articles
- Trekking in the Annapurna Region, Nepal: A Complete Guide
- Cast Away: Everything You Need to Know About the Start of Fishing Season
- The Great Alpine Highway in New Zealand
- How difficult is Everest Chola Pass Trek
- Dinosaur Provincial Park - Alberta's Hidden Gem
- The History Of The Roof Tent
- Navigating Winter Wonderland: Exploring Snowmobile Dealers in Cody, Wyoming"
- Hiking In The Smokies – Top Five Trails
- Best Outstation Cab Service in Mumbai: A Comprehensive Analysis
- Everest Base Camp Trek
- How Surf Camps in Morocco Revolutionizing the Surf Scene
- A Memorable Trip to Varanasi
- 7 Reasons to Make a Holiday Tour in Nepal
- EXPLORING THE POINT BREAKS IN MOROCCO
- The Kaleidoscope of Purple: Exploring the Captivating Diversity of Ireland's Purple Flowers
- Living off the Grid in Today's World: Challenges and Opportunities
- Best places to visit in Peru
- Poison Ivy: Risks and Symptoms
- Top Reasons Why You Should Take a Safari in Tanzania
- Have You Prepared Your Kids for a Survival Situation
- Fly Fishing in Belize
- Introduction to Sea Turtle Hatchings
- Sabora Tented Camp: Africa’s Most Visionary Tented Safari ever?
- Kayaking And Fishing In The Key West
- Top Activities to Try in Rhodes Island
- Buy Drivers’ Licenses online
- Fishing Pole Setup Beginners with 3 Easy Steps
- Amazing 8 Tips To Troll For Striped Bass In A Lake
- Some Quick Advice For Snake Boots
- The Best Times For Safari In Kenya